Week 37, The End

10/7 - 10/16

 

I began this report with "1/29 - 2/2 The project is finally under way." Seems like more than nine months have passed! We have the C/O and there remains only punch work. This is the final ‘Developer Article' for Coeur de Terre. - The project is finally finished!

 

There are a few items left - nine lengths of the cable

{read more}railing on the right side had to be reordered (the lengths were too short), two of the three shower heads on the second floor are not to my liking so I am redoing those, the bunk room beds are waiting for the mattresses to construct the frames, and some miscellaneous painting and drywall touch-up is still pending. We are at the ‘substantial completion' point and the house is habitable.

 

 

The first scheduled owners will be arriving on the 18th. There are photos of the furnishings at http://www.vipfripp.com/photo-gallery/catid,8/ (the photo gallery, under furnishings). If you desire further details on any of the furnishings or views that do not appear, please call or e-mail and I will provide them.

 

 

 

Tomorrow I will e-mail (with regular mail copies) an outline of the anticipated closing timeline and method as well as where and when to send the balance of your contract balance.

 

Thank you all for the opportunity you have given me to design and build this house - this dream. Without qualification Coeur de Terre has been the most exciting and gratifying project in my thirty-year construction career.

 

Terry Chester, Builder/Member

TLC Construction, LLC

Comments (2)Add Comment
...
written by Chester, October 17, 2007
There are 3 queen mattresses and 1 king. The sofa bed is at least a queen as well. Additionally there will be 4 twin (approximate) bunks in the bunkroom.
report abuse
vote down
vote up
Votes: +0
...
written by Cheryl German, October 17, 2007
It's looking great! Congratulations and thanks for the new pictures. We've been carefully looking them over and over to get a feel of our new house! One question is size of mattresses....are they queen or king?
Thanks,
Cheryl
report abuse
vote down
vote up
Votes: +0

Write comment
You must be logged in to a comment. Please register if you do not have an account yet.

busy
 

Copyright VIPFripp © 2007
Beaufort, SC - (843) 524-1102 - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
 

 
Joomla Templates by Joomlashack
Joomla Templates and Joomla Tutorial