|
6/4 - 6/8 Insulation was installed Monday. The insulation inspection passed and we have stocked sheetrock. Drywall installers will begin hanging sheetrock on Monday. Those long delayed windows on the back of the house arrived Friday and were installed Saturday. Everything is pushing towards finishing now ... tile selections, flooring, interior trim materials, kitchen cabinetry, selecting
lighting fixtures, etc. A million and one details. The place will be hopping for the next six to eight weeks. My niece returned home with a cast on her leg and is going to make a full recovery from her snake bite. She made the front page of the Beaufort Gazette today (Monday).
|